A691 1-1/4CR Alloy Steel EFW Pipe (A691 Grade 1-1/4CR in Class 12, 22, 32)_pipe

A691 1-1/4CR Alloy Steel EFW Pipe
(A691 Grade 1-1/4CR in Class 12, 22, 32)

ASTM A691 1-1/4CR Pipe | A691 1-1/4CR Alloy Steel EFW Pipes | A691 1-1/4CR Chrome Moly Pipes Class 12, 22, 32.

ASTM A691 Grade 1-1/4CR Alloy Steel EFW Pipes | LSAW | HSAW | Welded Pipes

HSH China Manufacturer & Fabricator, Importer, Stockholder, Exporter of A691 1-1/4CR Carbon Steel EFW Pipes, premier suppliers of bulk A691 Alloy Steel EFW Pipes LSAW Stock worldwide. Fast delivery Guaranteed for every size A691 1-1/4CR Carbon Steel EFW Pipes, Carbon steel ASTM A691 Alloy Steel EFW Pipes & Alloy Steel Pipe, largest range of A691 1-1/4CR Alloy Steel EFW Pipes Suppliers in India.

covers carbon and alloy steel pipe, electric-fusion-welded with filler metal added, fabricated from pressure-vessel-quality plate of several analyses and strength levels and suitable for high-pressure service at high temperatures. Heat treatment may or may not be required to attain the desired mechanical properties. The pipes are classified according to steel grades and are designated in classes according to the type of heat treatment performed in the pipe manufacture, whether the weld is radiographically examined, and whether the pipe has been pressure tested. The steel welds shall be made either manually or automatically by an electric process involving the deposition of filler metal. The welded joints shall have positive reinforcement at the center of each side of the weld. The contour of this reinforcement shall be smooth, and the deposited metal shall be fused smoothly and uniformly into the plate surface. The joints shall undergo tension, bend and pressure tests. Unacceptable surface imperfections shall be removed by grinding or machining. The depression after grinding or machining shall be blended uniformly into the surrounding surface. Repair of weld and base metal defects shall be done by welding.

Specification & Range

Type ASTM A691 1-1/4CR, 2-1/4CR, 5CR, 9CR, 91 LSAW / SAW / EFW Pipe
Grades 1-1/4CR, 2-1/4CR, 5CR, 9CR, 9, P5, P9, P11, P12, P22, P91
ASTM A691 Standard Specification for Carbon and Alloy Steel Pipe, Electric-Fusion-Welded for High-Pressure Service at High Temperatures
Class Designation Class 10, 11, 12, 13, 20, 21, 22, 23, 30, 31, 32, 33, 34, 40, 41, 42, 43, 50, 51, 52, 53, 60, 61, 62, 63, 70, 71, 72, 73..
Size Outer Diameter Seamless  17-914mm    3/8-36 inch     
LSAW      457-1422mm  18-56 inch    
Wall Thickness 2-60mm
SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80 SCH100 SCH120 SCH140 SCH160 XXS
Length Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer’s actual request
Ends Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc
Surface Treatment Bare,Painting black,varnished,galvanized,anti-corrosion
PE PP/EP/FBE coating
Technical Methods Hot-rolled/Cold-drawn/Hot-expanded
Testing Methods Eddy current testing, Hydrostatic testing or Ultrasonic examination, NDT and also with chemical and physical property inspection
Packaging Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven bags; Suitable for lifting operation; Loaded in 40ft or 20ft container or in bulk

Also according to customer’s requests

Application Conveying oil, gas and water
MOQ 1 ton
Production Capacity 5000 T/M
Delivery Time Within 2 Weeks

Heat Treatment of A691 1-1/4CR Alloy Steel EFW Pipes

Pipe Grade ASTM Specification Post-Weld Heat-Treat Temperature Range (Stress Relieving), °F (°C) Normalizing  Temperature max unless otherwise noted, Quenching  Temperature max unless otherwise noted,°F (°C) Tempering Temperature, min, °F (°C)
CM-65 A 204/A 204M 1100 to 1200 (590 to 650) 1700 (925)
CM-70 A 204/A 204M 1100 to 1200 (590 to 650) 1700 (925)
CM-75 A 204/A 204M 1100 to 1200 (590 to 650) 1700 (925)
CMSH-70 A 537/A 537M 1100 to 1200 (590 to 650) 1700 (925)
CMS-75 A 299/A 299M 1100 to 1200 (590 to 650) 1700 (925)
CMSH-80 A 537/A 537M 1100 to 1200 (590 to 650) A 1700( 925) 1100 to 1250 (590 to 675)
1/2CR A 387/A 387M 1100 to 1300 (590 to 705) 1850 (1010) 1700( 925) 150 to 1375 (620to745)
1CR A 387/A 387M 1100 to 1350 (590 to 730) 1850 (1010) 1700 (925) 150 to 1375 (620to745)
11⁄4CR A 387/A 387M 1100 to 1375 (590 to 745) 1850 (1010) 1700 (925) 150 to 1375 (620to745)
21⁄4CR A 387/A 387M 1200 to 1400 (650 to 760) 1850 (1010) 1700 (925) 250 to 1400(675 to760)
3CR A 387/A 387M 1200 to 1400 (650 to 760) 1850 (1010) 1700 (925) 250 to1400 (675 to760)
5CR A 387/A 387M 1200 to 1400 (650 to 760) 1850 (1010) 1650 (900) 1300 to1400 (705 to760)
9CR A 387/A 387M 1325 to 1375 (715 to 745) B 1325 to1375 (715 to745)
91 A 387/A 387M 1350 to 1420 (730 to 770) 11900 to 2000             (1040 to 1095) 1900 min (1040 min) 1350 to 1440 (730 to 780)

*A Requires quenching and tempering.
*B 9CR steel is an air-hardenable steel, at times retaining austenite down to near atmospheric temperature. Good practice is to allow the steel to cool to 150° For lower before subjecting the steel to a tempering treatment or post-weld heat treatment.

A691 1-1/4CR Alloy Steel EFW LSAW Pipes Class

Class Heat Treatment on Pipe Section see: Radiography,
see Section
Pressure
Test, see :
10 none none none
11 none 9 none
12 none 9 8.3
13 none none 8.3
21 stress relieved, see 6.3.1 none none
21 stress relieved, see 6.3.1 9 none
22 stress relieved, see 6.3.1 9 8.3
23 stress relieved, see 6.3.1 none 8.3
31 normalized, see 6.3.2 none none
31 normalized, see 6.3.2 9 none
32 normalized, see 6.3.2 9 8.3
33 normalized, see 6.3.2 none 8.3
40 normalized and tempered, see 6.3.3 none none
43 normalized and tempered, see 6.3.3 9 none
43 normalized and tempered, see 6.3.3 9 8.3
43 normalized and tempered, see 6.3.3 none 8.3
50 quenched and tempered, see 6.3.4 none none
51 quenched and tempered, see 6.3.4 9 none
52 quenched and tempered, see 6.3.4 9 8.3
53 quenched and tempered, see 6.3.4 none 8.3
60 normalized and precipitation heat none none treated none none
61 normalized and precipitation heat none none treated 9 none
62 normalized and precipitation heat none none treated 9 8.3
63 normalized and precipitation heat none none treated none 8.3
70 normalized and precipitation heat none none treated none none
71 normalized and precipitation heat none none treated 9 none
72 normalized and precipitation heat none none treated 9 8.3
73 normalized and precipitation heat none none treated none 8.3

Plate Specification to Manufacturer A691 1-1/4CR Alloy Steel EFW LSAW Pipes

Plate Material

Pipe Grade Type of Steel ASTM Specification HB, max
Number Grade
CM-65 carbon-molybdenum steel A204/A204M A 201
CM-70 carbon-molybdenum steel A204/A204M B 201
CM-75 carbon-molybdenum steel A204/A204M C 201
CMSH-70 carbon-manganese-silicon steel, normalized A537/A537M 1
CMS-75 carbon-manganese-silicon steel A299/A299M
CMSH-80 carbon-manganese-silicon steel, quenched and tempered A537/A537M 2
1/2 CR 1/2 % chromium, 1/2 % molybdenum steel A387/A387M 2 201
1 CR 1 % chromium, 1/2 % molybdenum steel A387/A387M 12 201
1 1/4 CR 1 1/4 % chromium, 1/2 % molybdenum steel A387/A387M 11 201
2 1/4 CR 2 1/4 % chromium, 1 % molybdenum steel A387/A387M 22 201
3 CR 3 % chromium, 1 % molybdenum steel A387/A387M 21 201
5 CR 5 % chromium, 1/2 % molybdenum steel A387/A387M 5 225
9 CR 9 % chromium, 1 % molybdenum steel A387/A387M 9 241
91 9 % chromium, 1 % molybdenum, vanadium, columbium A387/A387M 91 241

A Class I is Other Than Killed with a specified minimum tensile strength of 450 MPa or lower.
Class II is Other Than Killed with a specified minimum tensile strength of 450 to 520 MPa incl.
Class III is Killed with a specified minimum tensile strength of 450 MPa or lower.
Class IV is Killed with a specified minimum tensile strength of 450 to 520 MPa incl.
Class V is Killed with a specified minimum tensile strength of over 520 MPa to but not including 655 MPa.
Class VI is Killed with a specified minimum tensile strength of 655 MPa or over.
B Full size (10 by 10 mm) specimens.
C Testing temperature as specified in the purchase order, but no higher than 0°C

Chemical Composition of A691 1-1/4CR Alloy Steel EFW Pipes

(cast analysis, % by mass, maximum permitted unless indicated otherwise)

1CR 1-1/4CR 2-1/4 CR 5 CR 9 CR 91
C 0.05-0.17 0.05-0.17 0.05-0.15   0.15   0.15 0.08-0.12 
Mn 0.40-0.65  0.40-0.65 0.30-0.60  0.30-0.60  0.30-0.60  0.30-0.60 
P 0.025  0.025 0.025 0.025  0.025  0.020 
S 0.025  0.025  0.025  0.025  0.025  0.010 
Si 0.15-0.40  0.50-0.80 0.50 0.50 1.00  0.20-0.50 
Cr 0.80-1.15  1.00-1.50  2.00-2.50 4.00-6.00 8.00-10.00  8.00-9.50
Mo 0.45-0.60  0.45-0.65 0.90-1.10 0.45-0.65 0.90-1.10 0.85-1.05 
V   –   – 0.04  0.18-0.25

*Grade 91 also includes restrictions on Nickel 0.40 max, Columbium 0.06-0.10, Nitrogen 0.030-0.070, Aluminium 0.02 max, titanium 0.01 max, Zirconium 0.01 max.

Tensile Requirements of A691 1-1/4CR Alloy Steel EFW Pipes

Class 1 Plates

Grade Tensile (MPa) Yield (MPa) Elong. (50mm) Reduc’n of Area*
1CR 380 – 550 230 min 22% min
1-1/4CR 415 – 585 240 min 22% min
2-1/4CR, 5CR, 9CR 415 – 585 205 min 18% min 40% min
91 415 – 585 205 min 18% min 40% min

* Measured on a flat specimen

Class 2 Plates

Grade Tensile (MPa) Yield (MPa) Elong. (50 mm) Reduc’n of Area*
2 485 – 620 310 min 22% min
1-1/4CR 515 – 690 310 min 22% min 
1CR 450 – 585 275 min 22% min
2-1/4CR, 5CR, 9CR 515 – 690 310 min 18% min 40% min
91 585 – 760 415 min 18% min

* Measured on a flat specimen

As with all ASME and ASTM pressure vessel steels, Chrome Moly to SA387 and A387 is produced in conformity to SA20 / A20 which outlines the testing and retesting methods and procedures, permissable variations in dimensions and weight, quality and repair of defects, marking, loading, and ordering information.

In addition to the basic requirements of SA20 / A20 certain supplementary requirements are available when additional control, testing, or examination is required to meet end use requirements. These might include product analysis (S2), charpy V-notch impact test (S5), or ultrasonic testing (S12): a variety of supplementary requirements are available.

ASTM A691 Grade 1-1/4CR Alloy Steel EFW Pipe
We are Stockholder & Distributors of ASTM A691 Alloy Steel EFW Electric Fusion Welded Pipes in Grade 1CR Grade-12, 1.1/4CR Grade-11, 2.1/4CR Grade-22, 3CR Grade-21, 5CR Grade-5, 9CR Grade-9, Grade-91

  • ASTM A691 GRADE 1 1/4 CR Alloy Steel Pipes – contact Prosaic Steel for best price
  • ASTM A691 Carbon Steel & Alloy Steel Electric-Fusion Welded Pipes
  • ASTM A691 Grade CM65, ASTM A691 Grade CM-65
  • ASTM A691 Grade CM70, ASTM A691 Grade CM-70
  • ASTM A691 Grade CM75, ASTM A691 Grade CM-75
  • ASTM A691 Grade CMSH70, ASTM A691 Grade CMSH-70
  • ASTM A691 Grade CMS75, ASTM A691 Grade CMS-75
  • ASTM A691 Grade 1/2CR, ASTM A691 Grade-1/2 CR
  • ASTM A691 Grade 1CR, ASTM A691 Grade-1 CR
  • ASTM A691 Grade 12, ASTM A691 Grade-12
  • ASTM A691 Grade 3CR, ASTM A691 Grade-3 CR
  • ASTM A691 Grade 21, ASTM A691 Grade-21

A691 1-1/4CR Alloy Steel EFW Pipe Packing

A691 1-1/4CR Alloy Steel EFW Pipe is sleeved into plastic bag individually, pieces wrapped with water-proof material, bundled with nylon rope. Clear labels are tagged on the outside of the package for easy identification of the quantity and product I.D. Great care is taken during operation and transportation

A691 1-1/4CR, 2-1/4CR, 5CR, 9CR, 91 Alloy Steel EFW Pipe packing will be according to international standard in bundles strapped by strips then into containers to avoid any damage.

Delivery: Within 10-25 days or asap if we have enough stock

Types of Packaging:

  • – Bundles (hexagonal)
  • – Wooden Boxes
  • – Crates (steel/wooden)
  • – Special crates for U-Bend tubes with each radius separated
  • – Packaging for A691 1-1/4CR Alloy Steel EFW Pipe as per customer’s requirements

Special Features:

  • – Each bundle covered with plastic for protection against extreme weather.
  • – End of A691 1-1/4CR Alloy Steel EFW Pipe protected by plastic caps.
  • – Bundles strapped with plastic strips.
  • – Each radius of U-Bend tube separated by a separator.
  • – Packaging list (laminated) placed with box/crate.

A691 1-1/4CR Alloy Steel EFW Pipe Steel EFW Pipe Sizes Available in Stock with Price

  • 16″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 18″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 20″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 22″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 24″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 26″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 28″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 30″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 32″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 34″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 36″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 40″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 42″ NB in ThicknessSchedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 44″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 46″ NB in ThicknessSchedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 48″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 52″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 54″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 56″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 60″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 60″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 34″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW
  • 36″ NB in Thickness Schedule 20, Schedule 30, Schedule STD, Schedule 40, Schedule 60, Schedule 80, Schedule 100, Schedule 120, Schedule 160, Schedule XXS in ASTM A691 1-1/4CR Pipe Alloy Steel EFW Pipes in LSAW / EFW / DSAW / SSAW

We export A691 Grade 1-1/4CR Alloy Steel EFW Pipe to Saudi Arabia, Iran, Iraq, United Arab Emirates, Qatar, Bahrain, Oman, Kuwait, Turkey, Egypt, Yemen, Syria, Israel, Jordan, Cyprus, Singapore, Malaysia, Indonesia, Thailand, Vietnam, South Korea, Japan, Sri Lanka, Maldives, Bangladesh, Mayanmar, Taiwan, Cambodia, Argentina, Bolivia, Brazil, Chile, Venezuela, Colombia, Ecuador, Guyana, Paraguay, Uruguay, United States Of America, Canada, Mexico, Panama, Costa Rica, Puerto Rica, Trinidad And Tobago, Jamaica, Bahamas, Denmark, Russia, Norway, Germany, France, Italy, United Kingdom, Spain, Ukraine, Netherland, Belgium, Greece, Czech Republic, Portugal, Hungary, Albania, Austria, Switzerland, Slovakia, Finland, Ireland, Croatia, Slovenia, Malta, Nigeria, Algeria, Angola, South Africa, Libya, Egypt, Sudan, Equatorial Guinea, The Republic Of Congo, Gabon, europe, Africa, Asia, North America, South America, Middle East, Far East.etc

HSH is a well known worldwide exporter of A691 Grade 1-1/4CR Alloy Steel EFW Pipe, HSH is committed to provide each and every customer with the highest standard of customer service. We deals in in India & Overseas, offering a wide range of A691 Grade 1-1/4CR Alloy Steel EFW Pipe

HSH is Leading Manufacturer, Distributor, Exporter, Stockholder and Supplier of A691 Grade 1-1/4CR Alloy Steel EFW Pipe in United States of America (USA), Saudi Arabia, Iran, Iraq, Unites Arab Emirates (UAE), Turlkey, Singapore, Malaysia, Indonesia

HSH stocks a broad range of metal materials, including aluminum, steel, stainless steel, copper and brass, and specialty metals. Also, we also sell cast fittings, cast Iron, forged fittings, cutting tools, flanges, ect. If you have any needs about our products, you can contact us.
sales@https://www.metal-pipe.com